Default Shop Expansion - at last

I moved out to my acreage about 5 years ago. The shop lies in a 48x52 pole barn and had a finished heated area of 30x40. I talked to the fellow who built it and he said he always wished he had gone the full width of the building. I quickly had the 30x40 area really filled up with a 4 post hoist, lots of benches and tools, etc. I thought it would be awesome to have the full width of the shop to get the welding bench and metal working tools away from the vehicle bays. I had been gathering things like a washer dryer, etc to eventually build a bathroom out in the shop. Wife ended up asking for a doggy wash out there too.

There was a small room off to the side of the shop where the compressor sat. He ran a water line to the shop, but ran the water line straight up into the exterior wall so it would freeze every winter. I cut a hole in the wall and put in a duct blower to put some heat in there so the water line fittings wouldn't break (which would ultimately result in a mid winter thaw which would cause the water line to go full flow and pump a bunch of water into that room until my pressure system couldn't keep up and cut out).

Start of the pics. Teardown.
Attached Thumbnails
Click image for larger version

Name:	IMG_3619.jpg
Views:	238
Size:	92.5 KB
ID:	135954   Click image for larger version

Name:	IMG_3625.jpg
Views:	233
Size:	95.7 KB
ID:	135955   Click image for larger version

Name:	IMG_3657.jpg
Views:	218
Size:	96.0 KB
ID:	135958   Click image for larger version

Name:	20160729_121836.jpg
Views:	222
Size:	101.2 KB
ID:	135959   Click image for larger version

Name:	20160729_163539.jpg
Views:	217
Size:	100.1 KB
ID:	135960  


Last edited by KevinF; 10-06-2016 at 06:09 PM.
Reply With Quote
  #2  
Old 10-06-2016, 06:16 PM
KevinF KevinF is offline
Senior Member
 
Join Date: Nov 2013
Location: Saskatoon
Posts: 491
Default

Little out of order. I am not changing it. First post took me 6 tries to upload the pics. Always says connection timed out when I try using my phone as a hotspot.

First pic is a before shot of the expanded area from a couple years ago.

Pics of moving the water line further into the building. Me on the backhoe I bought in August. Wife on the mini hoe I rented to help with the plumbing.

The project got a delayed start this year because I spent much of the summer working away. And I was getting the 3 ton to a point where it would move under its own power again.
Attached Thumbnails
Click image for larger version

Name:	1.jpg
Views:	189
Size:	100.1 KB
ID:	135961   Click image for larger version

Name:	2.jpg
Views:	203
Size:	87.6 KB
ID:	135962   Click image for larger version

Name:	3.jpg
Views:	209
Size:	97.6 KB
ID:	135963   Click image for larger version

Name:	3-1.jpg
Views:	223
Size:	101.7 KB
ID:	135964   Click image for larger version

Name:	4.jpg
Views:	199
Size:	103.0 KB
ID:	135965  

Reply With Quote
  #3  
Old 10-06-2016, 06:22 PM
KevinF KevinF is offline
Senior Member
 
Join Date: Nov 2013
Location: Saskatoon
Posts: 491
Default

I rented a plate tamper and hauled in fill for the pad. Had planned on 4inch pad with a 6 inch thickened edge. I ended up working all weekend I had rented the plate tamper instead of hauling fill and tamping. I wanted to get the pad in. So the rebar went in and I got a 6-7 inch pad. I ordered 5.5m3. Just had enough excess to do the bonus pad in front of the door - very happy about that.

Bought the rebar from a local supplier. They had a 50 piece minimum. They were half the price of Co-op and 1/4 the price of Home Depot though, so even with lots of rebar in the pad and rebar left over, it ended up cheaper.

Hired a guy that had done work for one of Dad's buds to do the finishing.
Attached Thumbnails
Click image for larger version

Name:	5.jpg
Views:	175
Size:	100.4 KB
ID:	135966   Click image for larger version

Name:	6.jpg
Views:	168
Size:	90.7 KB
ID:	135967   Click image for larger version

Name:	7.jpg
Views:	173
Size:	101.1 KB
ID:	135968   Click image for larger version

Name:	8.jpg
Views:	180
Size:	94.8 KB
ID:	135969   Click image for larger version

Name:	9.jpg
Views:	182
Size:	98.0 KB
ID:	135970  

Reply With Quote
  #4  
Old 10-06-2016, 06:27 PM
KevinF KevinF is offline
Senior Member
 
Join Date: Nov 2013
Location: Saskatoon
Posts: 491
Default

I got the first order of lumber from a supplier here. The beam is an LVL (3100Fb) 9.5" height, 1.75" tripled up. The span is 18ft. The lumber from them was good and they fork loaded it which just allowed me to roll in with the gooseneck after a partial day at the office. Would have been ages picking through lumber at Home Depot.
Attached Thumbnails
Click image for larger version

Name:	10.jpg
Views:	196
Size:	99.9 KB
ID:	135971   Click image for larger version

Name:	11.jpg
Views:	193
Size:	101.2 KB
ID:	135972   Click image for larger version

Name:	12.jpg
Views:	197
Size:	102.0 KB
ID:	135973   Click image for larger version

Name:	13.jpg
Views:	197
Size:	98.8 KB
ID:	135974   Click image for larger version

Name:	14.jpg
Views:	190
Size:	33.7 KB
ID:	135975  

Reply With Quote
  #5  
Old 10-06-2016, 06:34 PM
KevinF KevinF is offline
Senior Member
 
Join Date: Nov 2013
Location: Saskatoon
Posts: 491
Default

A couple of windows went in upstairs. The front one is a little smaller due to the distance between the 4x6s. Framing around those 4x6s was a bastard. They were twisted badly. In the downstairs part we framed in between them. Upstairs we framed in between them on the front wall. For the side wall (the 30ft wall) we just put together a 30ft stud wall and set it against the twisted 4x6s so it was plumb and parallel to the tin..

Progress on the major stuff has slowed but I think we worked 16 days straight to get it to where it was mostly insulated and closed in. Then I had to go back and do some site work. Have been working on smaller stuff like phone/network wiring, dryer duct, 240v outlets, choosing a water heater, etc. Just today I grabbed a ramset from a friend and shot the walls down.

Cut and pasted this list from another thread on the forum here. It was a pretty busy fall but glad we got it to where we did in time.

July - Ripped 30x16 wall from shop. Did wiring and other stuff to 3 ton.
Aug 15 - Go look at Case 580 SL
Aug 16 - Pay for Case 580 SL and get it shipped home.
Aug 19 - Dig water line further into shop so it doesn't freeze in winter.
Aug 24 - 3 ton able to drive under own power (to get out of shop so excavation and concrete can be done)
Aug 26-27 - Rent mini hoe and dig trench from inside of shop building to outside of building for shop septic. Do rough in plumbing.
Sep 2 - Side slab insulation was dug in after septic hole backfilled. Rent plate tamper and start bringing pad up to grade.
Sep 7 - Rebar.
Sep 8 - Order 5.5m3 of 32MPa concrete for 11x30 pad. Pour pad.
Sep 9 - Bring home gooseneck load of lumber.
Sep 10 - Start framing.
Sep 11 - Shop bathroom framed and 18ft LVL in place.
Sep 12, 13 - 2x10x14 joists up for shop mezzanine.
Sep 15 - Joists blocked. Stairs cut and in place.
... some wiring, insulation, sheeting...
Sep 25 - Windows cut in and installed.
Sep 26 - Wiring, dryer vent, outside frost free tap, caulking windows.
Progress slowed this last week. Did some insulation and vapor barrier, FM antenna, ran additional wiring, vent stack etc.
Attached Thumbnails
Click image for larger version

Name:	15.jpg
Views:	174
Size:	97.9 KB
ID:	135976   Click image for larger version

Name:	16.jpg
Views:	173
Size:	93.3 KB
ID:	135977   Click image for larger version

Name:	17.jpg
Views:	193
Size:	97.6 KB
ID:	135978  

Last edited by KevinF; 10-06-2016 at 06:49 PM.
Reply With Quote
  #6  
Old 10-06-2016, 09:33 PM
Tim KS's Avatar
Tim KS Tim KS is offline
Master Procrastinator
 
Join Date: Oct 2004
Location: SC KS
Posts: 3,261
Default

It looks like you're doing a top notch job. Just how many trips to that refrigerator did it take to get that all done.
__________________
We are all given many opportunities in life to keep our mouth shut.....we should take advantage of as many of those opportunities that we can.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Web Search:

All times are GMT -5. The time now is 12:33 AM.


Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2017, vBulletin Solutions, Inc.